top of page

OUR PROJECTS

Here is a list of recent projects that our Management team has worked on.

DSC_0190.jpg

01

RE-DEVELOPMENT

A 100+ year old field that had 99.5% water cut was redeveloped with enhanced recovery methods (Steamflood and Waterflood) to push recovery past 100 Million barrels!

02

STEAMFLOOD

Two steamflood projects but both extremely unique and versatile. First project is an Engineering marvel; steam injection in a highly permeable reservoir with high water drive. Second project is one of the shallowest steamflood in the world!

0968.jpg
DSC_0220.jpg

03

WATERFLOOD

A typical inverted 5-spot pattern waterflood had to be re-imagined when horizontal producers were drilled that intercepted the patterns. Read more to find out what the challenges were and how they were resolved.

04

200+ HORIZONTAL WELLS

Major oil company overlooked a low permeability zone when field was first discovered. The advent of horizontal well technology and sound understanding of the reservoir resulted in a 200+ horizontal well drilling program.

MAC-OIL-0146.jpg
bottom of page